CH floor plans

SPECIFICATION

  • New 3 pipe VRV air conditioning
  • New LED lighting throughout
  • New fully accessed raised floors
  • Fully refurbished lift
  • 2 superloos per floor
  • 22 bicycle stations, 5 showers, 2 changing rooms, vanity area, lockers & drying area
  • New CCTV to communal areas
  • New fire alarm throughout
  • Broadband Fibre Installed – 1GB leased line to building with 20MB Committed Data Rate with connections to each office floor.
  • EPC: C-69

Plowman Craven measured floor areas (IPMS 3 – Office) are as follows:

Accommodation table